{"id":"mellitah-structure-e-subsea-well-equipment-prequalification-prq37-2026","canonicalSlug":"mellitah-structure-e-subsea-well-equipment-prequalification-prq37-2026","url":"https://wellficent.com/en/news/mellitah-structure-e-subsea-well-equipment-prequalification-prq37-2026","language":"en","title":"Mellitah invites prequalification for subsea systems and well equipment installation","summary":"Mellitah’s PRQ/JPT/37/26 prequalification covers a subsea EPIC package including installation and testing of four production Christmas trees, with applications due on 5 November 2026.","body":["Mellitah Oil & Gas B.V.’s Libyan Branch published prequalification PRQ/JPT/37/26 on 7 October 2026 for the Structure E and CO2 sealines and subsea systems EPIC package. The WP4B1 scope includes rigid well jumpers, pipelines, manifolds and umbilicals, plus transport, installation and testing of four production Christmas trees.","The trees are separately supplied or transferred by novation from WP4B3; their manufacture is outside this package, as is standalone platform construction. The prequalification deadline is 5 November 2026, with no hour or time zone stated. This invitation is not an invitation to tender and guarantees neither admission nor a contract award. No contract value or specific well fluid is stated."],"keyPoints":[],"sections":[],"text":"Mellitah invites prequalification for subsea systems and well equipment installation\n\nMellitah’s PRQ/JPT/37/26 prequalification covers a subsea EPIC package including installation and testing of four production Christmas trees, with applications due on 5 November 2026.\n\nMellitah Oil & Gas B.V.’s Libyan Branch published prequalification PRQ/JPT/37/26 on 7 October 2026 for the Structure E and CO2 sealines and subsea systems EPIC package. The WP4B1 scope includes rigid well jumpers, pipelines, manifolds and umbilicals, plus transport, installation and testing of four production Christmas trees.\n\nThe trees are separately supplied or transferred by novation from WP4B3; their manufacture is outside this package, as is standalone platform construction. The prequalification deadline is 5 November 2026, with no hour or time zone stated. This invitation is not an invitation to tender and guarantees neither admission nor a contract award. No contract value or specific well fluid is stated.\n\nTender notice\n\nIssuer: Mellitah Oil & Gas B.V. — Libyan Branch, JPT\n\nNotice reference: PRQ/JPT/37/26\n\nNotice type: Expression of interest\n\nTender status: Open\n\nNotice date: 7 October 2026\n\nSubmission deadline: 5 November 2026\n\nDeadline date only; no closing time is stated.\n\nDeadline timezone is not stated.\n\nIssuer country: Libya\n\nWell sector: Unclassified\n\nProcurement activity: Well equipment, Well services\n\nEvidence checked at: 2026-10-13T17:01:53Z","category":"energy","region":"world","topics":[],"eventDate":"2026-10-07","eventDateBasis":"source-event-or-period","publishedAt":"2026-10-13T17:51:48Z","modifiedAt":"2026-10-13T17:51:48Z","publicationBasis":"first-publication","preparedAt":"2026-10-13T17:17:05Z","sourcePublishedAt":"2026-10-07","translatedAt":"2026-10-13T17:12:28Z","sources":[{"url":"https://mellitahog.ly/en/tender/epic-for-sealines-and-subsea-systems-for-structure-e-and-co2-project/","name":"Mellitah — prequalification PRQ/JPT/37/26","checkedAt":"2026-10-13","publishedAt":"2026-10-07"},{"url":"https://mellitahog.ly/en/wp-content/uploads/2026/10/Attachment-No-2_EPIC-Sealine-Subsea_SoW_IH_HF_05.10.2026-GdM.docx","name":"Mellitah — official WP4B1 sealines and subsea scope of work","checkedAt":"2026-10-13"}],"translations":{"en":"https://wellficent.com/en/news/mellitah-structure-e-subsea-well-equipment-prequalification-prq37-2026","tr":"https://wellficent.com/tr/news/mellitah-structure-e-subsea-well-equipment-prequalification-prq37-2026","ar":"https://wellficent.com/ar/news/mellitah-structure-e-subsea-well-equipment-prequalification-prq37-2026","fr":"https://wellficent.com/fr/news/mellitah-structure-e-subsea-well-equipment-prequalification-prq37-2026","es":"https://wellficent.com/es/news/mellitah-structure-e-subsea-well-equipment-prequalification-prq37-2026","ru":"https://wellficent.com/ru/news/mellitah-structure-e-subsea-well-equipment-prequalification-prq37-2026","pt":"https://wellficent.com/pt/news/mellitah-structure-e-subsea-well-equipment-prequalification-prq37-2026"},"corrections":[],"locations":[],"type":"tender","tender":{"money":null,"issuer":{"name":"Mellitah Oil & Gas B.V. — Libyan Branch, JPT","countryCode":"LY"},"status":"open","version":"1","deadline":{"at":"2026-11-05","timeZone":null,"precision":"day"},"reference":"PRQ/JPT/37/26","noticeDate":"2026-10-07","noticeType":"expression-of-interest","officialUrl":"https://mellitahog.ly/en/tender/epic-for-sealines-and-subsea-systems-for-structure-e-and-co2-project/","procurement":{"sectors":[],"sourceUrl":"https://mellitahog.ly/en/tender/epic-for-sealines-and-subsea-systems-for-structure-e-and-co2-project/","activities":["well-equipment","well-services"],"verifiedAt":"2026-10-13T17:01:53Z"}},"tenderDeadlinePassed":false}