{"id":"reservoir-volumetrics-oil-in-place-recovery-reserves","canonicalSlug":"reservoir-volumetrics-oil-in-place-recovery-reserves","url":"https://wellficent.com/en/news/reservoir-volumetrics-oil-in-place-recovery-reserves","language":"en","title":"Oil in place, recovery and reserves: a reservoir volumetrics example","summary":"Reproduce an oil-in-place estimate in SI units, test net pay and recovery assumptions, and use a real Well Atlas record to see why the depth reference matters.","body":["An estimate of oil initially in place gives the original stock-tank equivalent of the oil inside a defined reservoir volume. It combines net rock volume, porosity, oil saturation and fluid shrinkage to surface conditions. A recovery factor is a separate assumption about the share that a development could recover. A reserves classification also requires evidence for the accumulation, technical recovery and the commercial project at the evaluation date. The quantities answer different questions, even when all are expressed in cubic metres at surface conditions.","This example uses the volumetric relationship in the Bureau of Ocean Energy Management’s Form BOEM-0127 instructions and works entirely in SI units. All model inputs below are hypothetical. A separate example from the Norwegian Offshore Directorate and Well Atlas illustrates how a real well record identifies its depth reference. The well record supplies none of the inputs to the volume calculation."],"keyPoints":[],"sections":[{"heading":"Bound the oil-bearing rock first","paragraphs":["Start with the footprint of the oil-bearing interval under the chosen contacts and compartment boundaries. Multiply by vertical net pay if a single representative thickness is defensible. For this example the area is 1.8 square kilometres and the representative net pay is 12 metres. Converting area to 1,800,000 square metres gives 21,600,000 cubic metres of net rock. Net pay here already excludes rock that falls outside the declared reservoir and pay criteria. Applying a second net-to-gross multiplier would remove part of that rock twice.","The thickness must have the same geometric basis as the map. A length along a deviated borehole can differ from the vertical thickness used with a plan-view map, and dipping beds can require a separate geometric correction. A more detailed evaluation can sum individual cell volumes instead. Each cell needs a consistent oil zone, effective porosity and saturation definition. Averaging porosity and saturation independently and multiplying the averages can lose their covariance. Sum products of net rock volume, porosity and saturation, then apply fluid properties at the appropriate scale."]},{"heading":"Convert pore volume to stock-tank volume","paragraphs":["Use the SI equation N = A × h × φ × So ÷ Boi. Here N is stock-tank cubic metres, A is square metres, h is metres, φ is porosity as a fraction and So is initial oil saturation as a fraction. Boi is the initial oil formation volume factor in reservoir cubic metres per stock-tank cubic metre. The rounded field-unit conversion factor 7,758 in the BOEM instructions converts acre-feet to barrels. An SI calculation already uses cubic metres for the rock volume and omits that factor.","For the hypothetical interval, take φ = 0.19 and initial water saturation Sw = 0.30. Only oil and water occupy the pore space in this example, so So = 1 − Sw = 0.70. The resulting pore volume is 4,104,000 cubic metres. Multiplying by So gives 2,872,800 reservoir cubic metres of oil. Dividing by Boi = 1.25 reservoir cubic metres per stock-tank cubic metre gives 2,298,240 stock-tank cubic metres initially in place. Retain the unrounded arithmetic for checking. The significant figures on a reported estimate would reflect the uncertainty of the reservoir inputs."]},{"heading":"Read the datum on a real well record","paragraphs":["The Norwegian Offshore Directorate reports 3,050 metres of measured depth (MD) and 3,020 metres of true vertical depth (TVD) at total depth for wellbore 16/11-1 S. Both are referenced to the rotary kelly bushing (RKB). The bushing is 27 metres above mean sea level. Using positive depth downwards, the reported total TVD corresponds to 2,993 metres below mean sea level. The Well Atlas record no-sodir-112 preserves the source identity and the MD/RKB entry. The regulator’s page supplies the TVD and elevation used for this conversion.","The Directorate records the well as a dry hole and says that no drill-stem test was performed. The 3,050-metre trajectory length is an end point, and the difference of 30 metres between total MD and TVD measures neither net pay nor a contact interval. In a volumetric study, the reservoir top, base and fluid contacts need their own measured or interpreted depths on a common datum. A useful data handoff retains each original depth type and datum alongside any converted value."]},{"heading":"Vary net pay and project recovery separately","paragraphs":["If net pay changes from 12 metres to 9 or 15 metres, holding the other inputs fixed, the computed in-place volumes become 1,723,680 and 2,872,800 stock-tank cubic metres. The volume varies linearly with thickness in this simplified model. A real reinterpretation of the contacts can also change area, the saturation profile and which rock qualifies as net pay. Holding those variables constant here isolates the arithmetic effect of the thickness assumption.","At 12 metres, a 20%, 30% or 40% recovery assumption yields an illustrative 459,648, 689,472 or 919,296 stock-tank cubic metres. The chart changes only the recovery factor. It assigns no probabilities to the cases. A development forecast would need a project description, production and pressure evidence where available, an understanding of displacement and well access, and a checked recovery model. A similar field can constrain assumptions when its reservoir and development characteristics are documented. Proximity by itself is insufficient."]},{"heading":"What would support a reserves claim","paragraphs":["For a discovered accumulation, a project team needs to relate technical recovery to a specific development plan, supplement the static model with flow evidence as the project matures and evaluate facilities and commercial constraints. Timing, investment, operating costs, prices and the economic limit affect the volume that can be recovered commercially. Subtracting cumulative production also requires a consistent reference date and product basis. The Petroleum Resources Management System and BOEM classification guidance provide the terminology for those decisions.","For reproducibility, retain a map or area estimate version, the net-pay cutoffs, contact assumptions, source logs, the saturation method and the pressure and temperature basis for laboratory fluid data. Add the evaluation date, units and a note identifying each measured, interpreted and assumed input. That record makes it possible to change one assumption, reproduce the result and see which new observation could materially narrow the range."]}],"text":"Oil in place, recovery and reserves: a reservoir volumetrics example\n\nReproduce an oil-in-place estimate in SI units, test net pay and recovery assumptions, and use a real Well Atlas record to see why the depth reference matters.\n\nAn estimate of oil initially in place gives the original stock-tank equivalent of the oil inside a defined reservoir volume. It combines net rock volume, porosity, oil saturation and fluid shrinkage to surface conditions. A recovery factor is a separate assumption about the share that a development could recover. A reserves classification also requires evidence for the accumulation, technical recovery and the commercial project at the evaluation date. The quantities answer different questions, even when all are expressed in cubic metres at surface conditions.\n\nThis example uses the volumetric relationship in the Bureau of Ocean Energy Management’s Form BOEM-0127 instructions and works entirely in SI units. All model inputs below are hypothetical. A separate example from the Norwegian Offshore Directorate and Well Atlas illustrates how a real well record identifies its depth reference. The well record supplies none of the inputs to the volume calculation.\n\nBound the oil-bearing rock first\n\nStart with the footprint of the oil-bearing interval under the chosen contacts and compartment boundaries. Multiply by vertical net pay if a single representative thickness is defensible. For this example the area is 1.8 square kilometres and the representative net pay is 12 metres. Converting area to 1,800,000 square metres gives 21,600,000 cubic metres of net rock. Net pay here already excludes rock that falls outside the declared reservoir and pay criteria. Applying a second net-to-gross multiplier would remove part of that rock twice.\n\nThe thickness must have the same geometric basis as the map. A length along a deviated borehole can differ from the vertical thickness used with a plan-view map, and dipping beds can require a separate geometric correction. A more detailed evaluation can sum individual cell volumes instead. Each cell needs a consistent oil zone, effective porosity and saturation definition. Averaging porosity and saturation independently and multiplying the averages can lose their covariance. Sum products of net rock volume, porosity and saturation, then apply fluid properties at the appropriate scale.\n\nConvert pore volume to stock-tank volume\n\nUse the SI equation N = A × h × φ × So ÷ Boi. Here N is stock-tank cubic metres, A is square metres, h is metres, φ is porosity as a fraction and So is initial oil saturation as a fraction. Boi is the initial oil formation volume factor in reservoir cubic metres per stock-tank cubic metre. The rounded field-unit conversion factor 7,758 in the BOEM instructions converts acre-feet to barrels. An SI calculation already uses cubic metres for the rock volume and omits that factor.\n\nFor the hypothetical interval, take φ = 0.19 and initial water saturation Sw = 0.30. Only oil and water occupy the pore space in this example, so So = 1 − Sw = 0.70. The resulting pore volume is 4,104,000 cubic metres. Multiplying by So gives 2,872,800 reservoir cubic metres of oil. Dividing by Boi = 1.25 reservoir cubic metres per stock-tank cubic metre gives 2,298,240 stock-tank cubic metres initially in place. Retain the unrounded arithmetic for checking. The significant figures on a reported estimate would reflect the uncertainty of the reservoir inputs.\n\nRead the datum on a real well record\n\nThe Norwegian Offshore Directorate reports 3,050 metres of measured depth (MD) and 3,020 metres of true vertical depth (TVD) at total depth for wellbore 16/11-1 S. Both are referenced to the rotary kelly bushing (RKB). The bushing is 27 metres above mean sea level. Using positive depth downwards, the reported total TVD corresponds to 2,993 metres below mean sea level. The Well Atlas record no-sodir-112 preserves the source identity and the MD/RKB entry. The regulator’s page supplies the TVD and elevation used for this conversion.\n\nThe Directorate records the well as a dry hole and says that no drill-stem test was performed. The 3,050-metre trajectory length is an end point, and the difference of 30 metres between total MD and TVD measures neither net pay nor a contact interval. In a volumetric study, the reservoir top, base and fluid contacts need their own measured or interpreted depths on a common datum. A useful data handoff retains each original depth type and datum alongside any converted value.\n\nVary net pay and project recovery separately\n\nIf net pay changes from 12 metres to 9 or 15 metres, holding the other inputs fixed, the computed in-place volumes become 1,723,680 and 2,872,800 stock-tank cubic metres. The volume varies linearly with thickness in this simplified model. A real reinterpretation of the contacts can also change area, the saturation profile and which rock qualifies as net pay. Holding those variables constant here isolates the arithmetic effect of the thickness assumption.\n\nAt 12 metres, a 20%, 30% or 40% recovery assumption yields an illustrative 459,648, 689,472 or 919,296 stock-tank cubic metres. The chart changes only the recovery factor. It assigns no probabilities to the cases. A development forecast would need a project description, production and pressure evidence where available, an understanding of displacement and well access, and a checked recovery model. A similar field can constrain assumptions when its reservoir and development characteristics are documented. Proximity by itself is insufficient.\n\nWhat would support a reserves claim\n\nFor a discovered accumulation, a project team needs to relate technical recovery to a specific development plan, supplement the static model with flow evidence as the project matures and evaluate facilities and commercial constraints. Timing, investment, operating costs, prices and the economic limit affect the volume that can be recovered commercially. Subtracting cumulative production also requires a consistent reference date and product basis. The Petroleum Resources Management System and BOEM classification guidance provide the terminology for those decisions.\n\nFor reproducibility, retain a map or area estimate version, the net-pay cutoffs, contact assumptions, source logs, the saturation method and the pressure and temperature basis for laboratory fluid data. Add the evaluation date, units and a note identifying each measured, interpreted and assumed input. That record makes it possible to change one assumption, reproduce the result and see which new observation could materially narrow the range.\n\nTechnical and economic analysis\n\nAnalysis as of: 2026-11-26\n\nEvidence cutoff: 2026-11-26\n\nOutlook horizon: Static volumetric example and project recovery sensitivity\n\nIllustrative sensitivity\n\nIllustrative oil recovery at 12 metres of net pay\n\nOnly the recovery factor varies. Initial oil in place is held at 2,298,240 stock-tank cubic metres. The scenarios have no assigned probabilities.\n\nThese calculations illustrate stated assumptions; they are not observations or a calibrated forecast.\n\n20% recovery: 459,648 stock-tank m³\n\n30% recovery: 689,472 stock-tank m³\n\n40% recovery: 919,296 stock-tank m³","category":"energy","region":"world","topics":[],"eventDate":"2026-11-26","eventDateBasis":"analysis-as-of-date","publishedAt":"2026-11-27T07:22:06Z","modifiedAt":"2026-11-27T07:22:06Z","publicationBasis":"first-publication","preparedAt":"2026-11-26T23:26:04Z","sourcePublishedAt":null,"translatedAt":null,"sources":[{"url":"https://www.boem.gov/sites/default/files/documents/newsroom/BOEM-0127_Form_Reporting_Instructions.pdf","name":"U.S. BOEM • Form BOEM-0127 instructions, item 145","checkedAt":"2026-11-26"},{"url":"https://info.specommunications.org/rs/833-LLT-087/images/petroleum_resources_management_system-2018.pdf","name":"SPE • Petroleum Resources Management System 2018, §§ 1.1 and 4.1.2","licence":"CC BY-NC-ND 4.0","checkedAt":"2026-11-26","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/"},{"url":"https://www.boem.gov/oil-gas-energy/resource-evaluation/classification-and-methodology-reserves-calculations","name":"U.S. BOEM • classification and methodology for reserves","checkedAt":"2026-11-26"},{"url":"https://factpages.sodir.no/en/wellbore/pageview/with/welllogs/112","name":"Norwegian Offshore Directorate • 16/11-1 S, wellbore 112","licence":"NLOD 2.0","checkedAt":"2026-11-26","licenseUrl":"https://data.norge.no/nlod/en/2.0","attribution":"Norwegian Offshore Directorate. Public FactPages wellbore summary."},{"url":"https://wellficent.com/en/wells/record/no-sodir-112","name":"Wellficent Atlas • Research reference • 16/11-1 S, wellbore no-sodir-112","checkedAt":"2026-11-26"}],"translations":{"en":"https://wellficent.com/en/news/reservoir-volumetrics-oil-in-place-recovery-reserves","tr":"https://wellficent.com/tr/news/reservoir-volumetrics-oil-in-place-recovery-reserves","ar":"https://wellficent.com/ar/news/reservoir-volumetrics-oil-in-place-recovery-reserves","fr":"https://wellficent.com/fr/news/reservoir-volumetrics-oil-in-place-recovery-reserves","es":"https://wellficent.com/es/news/reservoir-volumetrics-oil-in-place-recovery-reserves","ru":"https://wellficent.com/ru/news/reservoir-volumetrics-oil-in-place-recovery-reserves","pt":"https://wellficent.com/pt/news/reservoir-volumetrics-oil-in-place-recovery-reserves"},"corrections":[],"locations":[],"type":"analysis","analysis":{"asOf":"2026-11-26","kind":"technical-economic","chart":{"kind":"illustrative","note":{"ar":"لا يتغير إلا معامل الاستخلاص. ويظل حجم النفط الأصلي ثابتاً عند 2,298,240 متراً مكعباً في ظروف الخزان السطحي. ولم تُسنَد احتمالات إلى السيناريوهات.","en":"Only the recovery factor varies. Initial oil in place is held at 2,298,240 stock-tank cubic metres. The scenarios have no assigned probabilities.","es":"Solo cambia el factor de recuperación. El petróleo inicial in situ se mantiene en 2.298.240 metros cúbicos a condiciones de tanque. No se asignan probabilidades.","fr":"Seul le facteur de récupération varie. Le pétrole initial en place est fixé à 2 298 240 mètres cubes aux conditions de stockage. Aucune probabilité n’est attribuée.","pt":"Apenas o fator de recuperação varia. O petróleo inicial in situ é mantido em 2.298.240 metros cúbicos de tanque. Os cenários não têm probabilidades atribuídas.","ru":"Меняется только коэффициент извлечения. Начальный объём нефти фиксирован на уровне 2 298 240 кубометров при поверхностных условиях. Вероятности не присвоены.","tr":"Yalnızca kazanım faktörü değişir. Başlangıç yerinde petrolü 2.298.240 stok tankı metreküpünde sabittir. Senaryolara olasılık atanmamıştır."},"rows":[{"label":{"ar":"استخلاص 20%","en":"20% recovery","es":"Recuperación del 20 %","fr":"Récupération de 20 %","pt":"Recuperação de 20%","ru":"Извлечение 20%","tr":"%20 kazanım"},"value":459648},{"label":{"ar":"استخلاص 30%","en":"30% recovery","es":"Recuperación del 30 %","fr":"Récupération de 30 %","pt":"Recuperação de 30%","ru":"Извлечение 30%","tr":"%30 kazanım"},"value":689472},{"label":{"ar":"استخلاص 40%","en":"40% recovery","es":"Recuperación del 40 %","fr":"Récupération de 40 %","pt":"Recuperação de 40%","ru":"Извлечение 40%","tr":"%40 kazanım"},"value":919296}],"unit":"stock-tank m³","title":{"ar":"استخلاص النفط التوضيحي عند سماكة صافية تبلغ 12 متراً","en":"Illustrative oil recovery at 12 metres of net pay","es":"Recuperación ilustrativa con 12 metros de espesor útil","fr":"Récupération illustrée à 12 mètres d’épaisseur utile","pt":"Recuperação ilustrativa com 12 metros de espessura útil","ru":"Пример извлечения при эффективной толщине 12 метров","tr":"12 metre net kalınlıkta örnek petrol kazanımı"},"unitLabel":{"ar":"م³ عند ظروف خزان السطح","en":"stock-tank m³","es":"m³ a condiciones de tanque","fr":"m³ aux conditions de stockage","pt":"m³ em condições de tanque","ru":"м³ при поверхностных условиях","tr":"stok tankı m³"}},"horizon":"Static volumetric example and project recovery sensitivity","horizonLabel":{"ar":"مثال حجمي ساكن وحساسية استخلاص المشروع","en":"Static volumetric example and project recovery sensitivity","es":"Cálculo volumétrico estático y sensibilidad a la recuperación","fr":"Calcul volumétrique statique et sensibilité à la récupération","pt":"Cálculo volumétrico estático e sensibilidade à recuperação","ru":"Статический объёмный расчёт и чувствительность к извлечению","tr":"Statik hacim hesabı ve proje kazanımı duyarlılığı"},"evidenceCutoff":"2026-11-26"},"relatedArticles":[{"canonicalSlug":"well-log-depth-md-tvd-datum-engineering-guide","url":"https://wellficent.com/en/news/well-log-depth-md-tvd-datum-engineering-guide","title":"Well-log depth: MD, TVD and datum explained","language":"en"},{"canonicalSlug":"well-testing-productivity-index-drawdown-ipr-engineering-guide","url":"https://wellficent.com/en/news/well-testing-productivity-index-drawdown-ipr-engineering-guide","title":"Well Testing and Productivity Index: Drawdown, Units and an IPR Example","language":"en"},{"canonicalSlug":"oil-gas-production-data-rates-boe-decline-engineering-guide","url":"https://wellficent.com/en/news/oil-gas-production-data-rates-boe-decline-engineering-guide","title":"Oil and gas production data: rates, boe, decline and value","language":"en"}],"image":{"url":"https://wellficent.com/media/b3ec7271b8304418f4bcdaca574f130d538ff6dd7b1b207a4d1a1de1481edf8d.webp","width":1672,"height":941,"alt":"Conceptual cutaway of layered rock with imagined wells crossing a curved reservoir interval.","credit":"Wellficent / OpenAI. AI-generated conceptual illustration.","licenseUrl":"https://openai.com/policies/terms-of-use/"}}