{"id":"saipem-bouri-libya-gaz-modulu-kaldirma-2026","canonicalSlug":"saipem-7000-completes-bouri-gas-module-lift-in-libya","url":"https://wellficent.com/en/news/saipem-7000-completes-bouri-gas-module-lift-in-libya","language":"en","title":"Saipem 7000 completes Bouri gas-module lift in Libya","summary":"Site integration follows within the existing EPCI project.","body":["Saipem said on June 3 that it lifted the Bouri gas-recovery module onto an existing offshore platform. The Rosetti Marino-built module weighs more than 5,200 tonnes.","The milestone does not establish gas production start-up. Post-lift review needs separate acceptance records for hook-up, safety systems and commissioning. Placing heavy equipment and verifying operational performance are different delivery steps."],"keyPoints":[],"sections":[],"text":"Saipem 7000 completes Bouri gas-module lift in Libya\n\nSite integration follows within the existing EPCI project.\n\nSaipem said on June 3 that it lifted the Bouri gas-recovery module onto an existing offshore platform. The Rosetti Marino-built module weighs more than 5,200 tonnes.\n\nThe milestone does not establish gas production start-up. Post-lift review needs separate acceptance records for hook-up, safety systems and commissioning. Placing heavy equipment and verifying operational performance are different delivery steps.","category":"energy","region":"world","topics":["epc-contractors"],"eventDate":"2026-06-03","eventDateBasis":"source-event-or-period","publishedAt":"2026-10-02T19:10:47+03:00","modifiedAt":"2026-10-02T19:10:47+03:00","publicationBasis":"first-publication","preparedAt":null,"sourcePublishedAt":"2026-06-03","translatedAt":null,"sources":[{"name":"Saipem","url":"https://www.saipem.com/en/media/news/Saipem-7000-successfully-completes-the-lifting-of-the-gas-treatment-module-for-the-Bouri-project-in-Libya","checkedAt":"2026-10-02","publishedAt":"2026-06-03"}],"translations":{"en":"https://wellficent.com/en/news/saipem-7000-completes-bouri-gas-module-lift-in-libya","tr":"https://wellficent.com/tr/news/saipem-7000-completes-bouri-gas-module-lift-in-libya","ar":"https://wellficent.com/ar/news/saipem-7000-completes-bouri-gas-module-lift-in-libya","fr":"https://wellficent.com/fr/news/saipem-7000-completes-bouri-gas-module-lift-in-libya","es":"https://wellficent.com/es/news/saipem-7000-completes-bouri-gas-module-lift-in-libya","ru":"https://wellficent.com/ru/news/saipem-7000-completes-bouri-gas-module-lift-in-libya","pt":"https://wellficent.com/pt/news/saipem-7000-completes-bouri-gas-module-lift-in-libya"},"corrections":[],"locations":[]}