{"id":"afganistan-tapi-herat-boru-hatti-ilerleme-eylul-2026","canonicalSlug":"tapis-herat-section-reaches-122-3-kilometres-of-laid-pipeline","url":"https://wellficent.com/en/news/tapis-herat-section-reaches-122-3-kilometres-of-laid-pipeline","language":"en","title":"TAPI’s Herat section reaches 122.3 kilometres of laid pipeline","summary":"Ministry reports roughly 80% progress in welding and laying.","body":["Afghanistan’s Mines and Petroleum Ministry reported on September 15 that 122.3 kilometres of the Herat TAPI section had been welded and laid, roughly 80% of that work component.","Burial covered 71.5 kilometres and hydrostatic testing 33 kilometres. Herat distribution-network design continues. These distinct stages mean the percentage does not represent commissioning of the entire TAPI pipeline."],"keyPoints":[],"sections":[],"text":"TAPI’s Herat section reaches 122.3 kilometres of laid pipeline\n\nMinistry reports roughly 80% progress in welding and laying.\n\nAfghanistan’s Mines and Petroleum Ministry reported on September 15 that 122.3 kilometres of the Herat TAPI section had been welded and laid, roughly 80% of that work component.\n\nBurial covered 71.5 kilometres and hydrostatic testing 33 kilometres. Herat distribution-network design continues. These distinct stages mean the percentage does not represent commissioning of the entire TAPI pipeline.","category":"energy","region":"world","topics":["epc-contractors"],"eventDate":"2026-09-15","eventDateBasis":"source-event-or-period","publishedAt":"2026-10-02T19:33:07+03:00","modifiedAt":"2026-10-02T19:33:07+03:00","publicationBasis":"first-publication","preparedAt":null,"sourcePublishedAt":"2026-09-15","translatedAt":null,"sources":[{"name":"Afghanistan Ministry of Mines and Petroleum","url":"https://www.momp.gov.af/construction-progress-herat-section-tapi-project-has-reached-80-percent","checkedAt":"2026-10-02","publishedAt":"2026-09-15"}],"translations":{"en":"https://wellficent.com/en/news/tapis-herat-section-reaches-122-3-kilometres-of-laid-pipeline","tr":"https://wellficent.com/tr/news/tapis-herat-section-reaches-122-3-kilometres-of-laid-pipeline","ar":"https://wellficent.com/ar/news/tapis-herat-section-reaches-122-3-kilometres-of-laid-pipeline","fr":"https://wellficent.com/fr/news/tapis-herat-section-reaches-122-3-kilometres-of-laid-pipeline","es":"https://wellficent.com/es/news/tapis-herat-section-reaches-122-3-kilometres-of-laid-pipeline","ru":"https://wellficent.com/ru/news/tapis-herat-section-reaches-122-3-kilometres-of-laid-pipeline","pt":"https://wellficent.com/pt/news/tapis-herat-section-reaches-122-3-kilometres-of-laid-pipeline"},"corrections":[],"locations":[]}