{"id":"worley-abadi-lng-ccs-feed-2026","canonicalSlug":"worley-delivers-two-offshore-feed-packages-for-abadi-lng","url":"https://wellficent.com/en/news/worley-delivers-two-offshore-feed-packages-for-abadi-lng","language":"en","title":"Worley delivers two offshore FEED packages for Abadi LNG","summary":"The Masela Block work includes gas export and carbon storage pipelines.","body":["Worley announced delivery of front-end engineering design for two offshore infrastructure packages at INPEX’s Abadi LNG project in Indonesia. The scope includes approximately 150 kilometres of subsea infrastructure, gas export pipelines and carbon capture and storage pipelines.","The Indonesia-led work involved specialists in Singapore, Perth and Malaysia. Once developed, the INPEX project is expected to produce approximately 9.5 million tonnes of LNG annually. That is a future capacity target; FEED delivery does not signify operational production."],"keyPoints":[],"sections":[],"text":"The Masela Block work includes gas export and carbon storage pipelines.\n\nWorley announced delivery of front-end engineering design for two offshore infrastructure packages at INPEX’s Abadi LNG project in Indonesia. The scope includes approximately 150 kilometres of subsea infrastructure, gas export pipelines and carbon capture and storage pipelines.\n\nThe Indonesia-led work involved specialists in Singapore, Perth and Malaysia. Once developed, the INPEX project is expected to produce approximately 9.5 million tonnes of LNG annually. That is a future capacity target; FEED delivery does not signify operational production.","category":"energy","region":"world","topics":[],"eventDate":"2026-09-16","eventDateBasis":"source-event-or-period","publishedAt":"2026-09-16","modifiedAt":"2026-10-02T17:29:23+03:00","publicationBasis":"source-date","preparedAt":"2026-10-02T17:29:23+03:00","sourcePublishedAt":"2026-09-16","translatedAt":null,"sources":[{"name":"Worley","url":"https://www.worley.com/en/insights/our-news/conventional-energy/2026/delivers-feeds-indonesia-flagship-lng-and-ccs-development","checkedAt":"2026-10-02","publishedAt":"2026-09-16"}],"translations":{"en":"https://wellficent.com/en/news/worley-delivers-two-offshore-feed-packages-for-abadi-lng","tr":"https://wellficent.com/tr/news/worley-delivers-two-offshore-feed-packages-for-abadi-lng"},"corrections":[],"locations":[]}