{"version":"1","record":{"id":"warpo-bangladesh-350-monitoring-and-10-production-tube-wells-2026","canonicalSlug":"warpo-bangladesh-350-monitoring-and-10-production-tube-wells-2026","url":"https://wellficent.com/es/news/warpo-bangladesh-350-monitoring-and-10-production-tube-wells-2026","language":"es","title":"WARPO licita 350 pozos de monitoreo y 10 de producción en el noroeste de Bangladesh","summary":"La autoridad de recursos hídricos de Bangladesh solicita 350 pozos de monitoreo y 10 de producción para un proyecto en 13 distritos.","body":["La Organización de Planificación de Recursos Hídricos de Bangladesh (WARPO) busca una empresa que instale, desarrolle, pruebe y ponga en servicio 350 pozos tubulares de monitoreo y 10 pozos de producción para su proyecto de cartografía de acuíferos y evaluación del estrés hídrico. El paquete abarca 13 distritos del noroeste. El calendario asigna 200 pozos de monitoreo a 200 metros, 50 a 300 metros y 100 a profundidades de 80–100 metros en el acuífero principal. El plazo indicado es de ocho meses.","BPPA publicó el paquete NWHR13/PSN2 el 30 de septiembre de 2026 e indica cierre y apertura el 26 de octubre a las 16:00; no da nombre de zona horaria ni desfase. Los 400.000 BDT son garantía de oferta, no valor estimado del contrato. Los 600 lakh BDT son un requisito de experiencia contractual previa. No se indica tarifa documental. No aparece una adenda posterior en las páginas consultadas."],"keyPoints":[],"sections":[],"text":"WARPO licita 350 pozos de monitoreo y 10 de producción en el noroeste de Bangladesh\n\nLa autoridad de recursos hídricos de Bangladesh solicita 350 pozos de monitoreo y 10 de producción para un proyecto en 13 distritos.\n\nLa Organización de Planificación de Recursos Hídricos de Bangladesh (WARPO) busca una empresa que instale, desarrolle, pruebe y ponga en servicio 350 pozos tubulares de monitoreo y 10 pozos de producción para su proyecto de cartografía de acuíferos y evaluación del estrés hídrico. El paquete abarca 13 distritos del noroeste. El calendario asigna 200 pozos de monitoreo a 200 metros, 50 a 300 metros y 100 a profundidades de 80–100 metros en el acuífero principal. El plazo indicado es de ocho meses.\n\nBPPA publicó el paquete NWHR13/PSN2 el 30 de septiembre de 2026 e indica cierre y apertura el 26 de octubre a las 16:00; no da nombre de zona horaria ni desfase. Los 400.000 BDT son garantía de oferta, no valor estimado del contrato. Los 600 lakh BDT son un requisito de experiencia contractual previa. No se indica tarifa documental. No aparece una adenda posterior en las páginas consultadas.\n\nAviso de licitación\n\nEmisor: Water Resources Planning Organization (WARPO), Ministry of Water Resources\n\nReferencia del aviso: 42.02.0000.000.005.14.0013.25 / NWHR13/PSN2\n\nTipo de aviso: Convocatoria de licitación\n\nEstado de la licitación: Abierta\n\nFecha del aviso: 30 de septiembre de 2026\n\nFecha límite de presentación: 2026-10-26T16:00\n\nNo se indica la zona horaria del plazo.\n\nHora local declarada; no se ha registrado el desfase UTC. El plazo se considera vencido cuando esta hora ha pasado en todas las zonas horarias.\n\nGarantía de oferta: 400.000 BDT\n\nPaís de la entidad: Bangladés\n\nSector de pozos: Pozos de agua\n\nActividad de contratación: Perforación, Equipos de pozos, Servicios de pozos\n\nEvidencia comprobada el: 2026-10-13T15:38:10Z","category":"energy","region":"world","topics":[],"eventDate":"2026-09-30","eventDateBasis":"source-event-or-period","publishedAt":"2026-10-13T16:12:21Z","modifiedAt":"2026-10-13T16:12:21Z","publicationBasis":"first-publication","preparedAt":"2026-10-13T16:00:40Z","sourcePublishedAt":"2026-09-30","translatedAt":"2026-10-13T16:06:52Z","sources":[{"url":"https://www.bppa.gov.bd/advertisement-physical-service/details-98542.html","name":"Bangladesh Public Procurement Authority (BPPA), official notice 98542","checkedAt":"2026-10-13","publishedAt":"2026-09-30"},{"url":"https://www.bppa.gov.bd/advertisement-notices/advertisement-physical-service.html","name":"BPPA listing of current physical-service notices","checkedAt":"2026-10-13"}],"translations":{"en":"https://wellficent.com/en/news/warpo-bangladesh-350-monitoring-and-10-production-tube-wells-2026","tr":"https://wellficent.com/tr/news/warpo-bangladesh-350-monitoring-and-10-production-tube-wells-2026","ar":"https://wellficent.com/ar/news/warpo-bangladesh-350-monitoring-and-10-production-tube-wells-2026","fr":"https://wellficent.com/fr/news/warpo-bangladesh-350-monitoring-and-10-production-tube-wells-2026","es":"https://wellficent.com/es/news/warpo-bangladesh-350-monitoring-and-10-production-tube-wells-2026","ru":"https://wellficent.com/ru/news/warpo-bangladesh-350-monitoring-and-10-production-tube-wells-2026","pt":"https://wellficent.com/pt/news/warpo-bangladesh-350-monitoring-and-10-production-tube-wells-2026"},"corrections":[],"locations":[],"type":"tender","tender":{"money":{"basis":"bid-security","amount":400000,"currency":"BDT"},"issuer":{"name":"Water Resources Planning Organization (WARPO), Ministry of Water Resources","countryCode":"BD"},"status":"open","version":"1","deadline":{"at":"2026-10-26T16:00","timeZone":null,"precision":"minute"},"reference":"42.02.0000.000.005.14.0013.25 / NWHR13/PSN2","noticeDate":"2026-09-30","noticeType":"request-for-tenders","officialUrl":"https://www.bppa.gov.bd/advertisement-physical-service/details-98542.html","procurement":{"sectors":["water"],"sourceUrl":"https://www.bppa.gov.bd/advertisement-physical-service/details-98542.html","activities":["drilling","well-equipment","well-services"],"verifiedAt":"2026-10-13T15:38:10Z"}},"tenderDeadlinePassed":false},"directory":{"state":"current","deadlineState":"upcoming","deadlinePassed":false,"submissionsClosed":false,"evaluatedAt":"2026-10-23T15:07:41.150Z","classification":"reviewed"},"semantics":["Only published due non-withdrawn editorial tender briefs are returned. This is reviewed directory coverage, not a census of all procurement worldwide.","Issuer status is recorded from the cited notice and never rewritten by an elapsed deadline; an elapsed deadline instead closes submissions through state=archive, deadlineState=passed and submissionsClosed. Source verification is a past check, not continuous live monitoring or an eligibility guarantee.","The base directory and state=all show issued notices, excluding status=planned. state=planned is a separate procurement-plan view; status=planned selects it only when no explicit state is supplied. Coverage totals include both issued notices and plans; issuedNotices and planned are reported separately.","Current means issuer open and a source deadline not yet passed in its stated timezone/offset, or in any civil timezone when none is stated. Archive includes terminal statuses or passed deadlines. Unknown means current eligibility cannot be established for an issued notice. A planned procurement remains planned regardless of dates and is not an open invitation to bid.","Expected invitation dates are not submission deadlines. Planned records do not receive deadline eligibility or countdowns; recorded money retains its source basis. Verify the later official invitation and amendments before bidding.","Sectors and activities require explicit reviewed procurement source evidence; no keyword, issuer-country or company-name inference and no physical well joins. Empty arrays and absent procurement remain unclassified.","A day has no assumed closing time. A local minute without an explicit UTC offset remains an unknown instant; no browser/server timezone or issuer-country timezone is inferred. Without a usable offset or timezone, deadlineState is passed only once the deadline has elapsed in every civil timezone (UTC−12:00 to UTC+14:00), upcoming only while it is due in none, and unknown in between. today is the deadline date in the stated timezone/offset.","Deadline sort is closing soonest: deadlines not yet passed first, then records without a deadline, then passed deadlines most recent first. Known instants use their UTC day and time; uncertain clocks retain the reported calendar day. On a shared sort day, known instants precede uncertain clocks. No timezone is assigned to an uncertain clock. Monetary amounts retain currency and estimated-budget/awarded-value/bid-security basis.","Grouping requires exact issuer/country/reference/URL plus matching notice metadata and summaries; unknown references/dates and different lots/amendments stay separate. Every grouped brief retains its public link.","Source dates, access/check times and Wellficent first publication/update times remain separate. Null is unknown, never zero. Preserve source attribution and source-specific reuse conditions.","The official source catalogue is separate routing information, not additional tender records or proof of open bids. Its source/country counts never add to notice coverage. Directory counts beside each source cover its issuer country, not records attributed to that website.","GET/HEAD only. This page is an export of the selected result page, not a full-directory download. Follow next_url for the same selection."]}