Syrian petroleum-contract audit includes a precautionary asset freeze
The oversight authority reports approximately USD 104 million in frozen contractor assets pending investigation.
Global oil, natural gas, power, water, geothermal and mining news, well data and market analysis. Primary sources, clear dates and reporting in seven languages. Page 3
Kuyular ve sondaj: 40 results · Clear search
The oversight authority reports approximately USD 104 million in frozen contractor assets pending investigation.
The Damascus talks cover field performance and damaged infrastructure, without announcing a contract award.
The methodology takes effect on 1 November for Murban, Das, Umm Lulu and Upper Zakum grades.
Oilfield services support growth, while the company reports an early deployment of its AI-enabled island rig.
The USD 6.2 billion decision targets gas production from 2030, with drilling services assigned to ADNOC Drilling.
A four-year award worth approximately SAR 2 billion lifts the contractor’s reported backlog to SAR 18 billion.
Egypt drilling supports production while security disruption constrains Kurdistan processing utilization.
The second-quarter update distinguishes group financial performance from recovery at Tawke and Peshkabir.
The talks include a proposed AIQ Egypt platform; no completed national rollout or signed drilling contract is announced.
Mediterra’s investment program targets seven interventions and two new wells in the Aswan area.
Fayoum-4 is reported on stream, while the rig moves toward exploration and deepwater targets.
Egypt’s gas company separates FY2025/26 delivery from a planned 16-well campaign.
A source-linked view of global energy, wells and resources in seven languages.