Global oil, natural gas, power, water, geothermal and mining news, well data and market analysis. Primary sources, clear dates and reporting in seven languages.
Technical and economic analysis / 15 November 2026Distinguish crude processing, used-oil recovery and lubricant blending, then reproduce a hypothetical mass balance without turning it into a real refinery capacity or performance claim.
EIA — Refining crude oil: the refining process↗
Technical and economic analysis / 15 November 2026A reproducible petroleum engineering guide to pressure drawdown, single-phase productivity, test uncertainty and the limits of linking calculations to Well Atlas records.
SLB Energy Glossary — productivity index (PI)↗
Technical and economic analysis / 11 November 2026A reproducible liquid-density example explains refinery processing gain, mass conservation, yield definitions and the boundary between crude intake and secondary-unit throughput.
EIA — Short-Term Energy Outlook petroleum refining model, January 2024↗
Technical and economic analysis / 11 November 2026Primary-source cases from North Pole, Lumberton and Bakersfield explain why fuel-tax registration, cleanup status and tank inventory do not establish operating crude-refining capacity.
IRS — Active Fuel Refineries, 30 August 2026↗
Technical and economic analysis / 11 November 2026Verified EIA and NIST definitions, reproducible barrel-to-tonne calculations and a blending example explain why petroleum density conversions need a declared reference basis.
EIA — API gravity definition↗
Technical and economic analysis / 8 November 2026A petroleum-engineering guide to depth references, well logs and hydrostatic pressure, with a verified SODIR example and reproducible calculations.
Norwegian Offshore Directorate — wellbore 16/11-1 S, source record 112↗
Technical and economic analysis / 11 November 2026An engineering guide to reading production disclosures, with reproducible examples of operating days, oil equivalent, ownership, decline and revenue.
U.S. EIA — Energy units and calculators explained↗
Energy / 21 May 2024Kaminho develops Cameia and Golfinho. The verified plan uses an all-electric FPSO and reservoir reinjection of associated gas.
TotalEnergies — Kaminho final investment decision↗
Energy / 31 January 2025The P1000 milestone belongs to January 2025. First ore, ramp-up targets and demonstrated plant performance are different measures.
PLS — P1000 achieves first ore↗
Energy / 23 October 2026The 0.168 MW Wisconsin project remains within a licensing review, with an assessment targeted for July 2027.
Federal Energy Regulatory Commission↗
Energy / 28 October 2026The grid-equipment transaction remains subject to approvals, with completion expected in late 2027.
GE Vernova↗
Energy / 28 October 2026The filing supports evaluation of a first brine-development phase with Denison Mines.
Grounded Lithium↗