ODRÉ programme marks planned Montoir LNG-tank maintenance for 10 October
The 10 October common gas-operator programme marks planned storage maintenance at the Montoir LNG terminal. ODRÉ says the programme is indicative and each operator's own portal is authoritative.
A record in the ODRÉ common gas-operator works programme for 10 October 2026 marks the storage field for Elengy's Montoir terminal as “Maintenance.” The programme metadata defines that flag as planned work on a tank or ship berth; the Montoir row marks storage, while its jetty field is blank.
The dataset is a shared overview of restrictions and work entries across gas transport, storage and terminals, not a report of a national gas-supply outage. Its own notice says the overview is indicative and does not replace each operator's authoritative commercial work programme, which may contain additional details.
ODRÉ’s 10 October data refresh lists September deliveries of 1.800 TWh to chemicals, 1.361 TWh to refining and petrochemicals, 0.800 TWh to metallurgy and 2.032 TWh to centralized power generation.
Open Data Réseaux Énergies (ODRÉ), NaTran monthly industrial gas consumption dataset↗
The municipality says electricity work is scheduled from 15:00 to 17:00 on 13 October for three listed supply locations in Capanna and Vallo, not the entire town.
Comune di Vetto, notice of planned electricity supply interruption↗
w.
Beyond the wellhead, context.
A source-linked view of global energy, wells and resources in seven languages.
Optional first-party analytics records page activity, device/browser details and performance after you accept. IP addresses are encrypted and retained for 7 days; other measurements for 90 days. You can withdraw consent in Privacy choices.