The Dirección General de Aguas in Chile's Los Ríos region is inviting bids under 5617-5-LP26 for four new groundwater monitoring stations to extend its hydrometric network. The technical bases describe 260 linear metres of piezometer drilling and completion alternatives. That drilling quantity should not be read as the depth of each of the four stations.
The official source gives 13 October 2026 at 18:00 as the deadline without verifying a timezone, so no UTC instant is assigned. Its automatic extension clause is conditional; this brief does not assume a later cutoff. The CLP 100,000,000 amount is an estimated budget, not an award value. Applicants should verify the current issuer record before responding.
Optional first-party analytics records page activity, device/browser details and performance after you accept. IP addresses are encrypted and retained for 7 days; other measurements for 90 days. You can withdraw consent in Privacy choices.
Google Analytics starts only after you accept analytics. Google receives page views, engagement, browser/device details and your connection IP. Analytics cookies last up to 180 days. Search text, URL query strings and referrer paths are excluded. Advertising signals are disabled. You can reject or withdraw in Privacy choices. How Google uses data