Grenada invites civil works and equipment for two geothermal slimhole well sites
Grenada's three-lot procurement combines access roads, water supply and drill-pad works at two geothermal well sites with generators and submersible pumps.
The Government of Grenada's Ministry of Climate Resilience, the Environment and Renewable Energy is inviting bids under ICB No. B-1 for two geothermal slimhole well sites. The three-lot scope includes access roads, water supply infrastructure and drill-pad civil works, plus diesel generators and submersible electric pumps. Testing and commissioning are included in the described works.
These are enabling works and equipment for the two well sites, not the well-drilling contract itself. Submission is due on 6 November 2026 at 12:00 Atlantic Standard Time (UTC−04:00). The required bid security is a declaration without a stated monetary amount; it should not be converted into a zero-value security. The original notice publication date is unknown. Bidders should consult the official invitation for the lot requirements.
Optional first-party analytics records page activity, device/browser details and performance after you accept. IP addresses are encrypted and retained for 7 days; other measurements for 90 days. You can withdraw consent in Privacy choices.
Google Analytics starts only after you accept analytics. Google receives page views, engagement, browser/device details and your connection IP. Analytics cookies last up to 180 days. Search text, URL query strings and referrer paths are excluded. Advertising signals are disabled. You can reject or withdraw in Privacy choices. How Google uses data