Kuwait’s Electricity, Water and Renewable Energy Ministry announced technical discussions with Saudi Arabia on water interconnection. The programme was scheduled for September 29–30.
The first day included the National Water Control Center. Discussions cover controls, operation and further coordination; commissioning or final transmission capacity is not announced.
Optional first-party analytics records page activity, device/browser details and performance after you accept. IP addresses are encrypted and retained for 7 days; other measurements for 90 days. You can withdraw consent in Privacy choices.
Google Analytics starts only after you accept analytics. Google receives page views, engagement, browser/device details and your connection IP. Analytics cookies last up to 180 days. Search text, URL query strings and referrer paths are excluded. Advertising signals are disabled. You can reject or withdraw in Privacy choices. How Google uses data