Oil India invites bids under GEM/2026/B/7933979 for four years of well design and engineering services. Corrigendum No. 3, dated 6 October, updates experience criteria for completed well-design and engineering jobs or wells. The notice identifies no target well or fluid type and states no contract budget.
Corrigendum No. 2, dated 29 September, sets the cutoff at 14 October 2026, 14:00 IST, with opening on 15 October at 14:00 IST. Corrigendum No. 3, issued 6 October, is later and updates experience eligibility; it does not change that deadline. Bidders should check current official documents for full eligibility rules and submission details.
Libya’s AGOCO lists electrical connection works at five named wells. The 25 October 2026 bid deadline follows a booklet collection period that has already ended.
National Oil Corporation of Libya — Arabian Gulf Oil Company tender MTC-33/2026↗
ONGC requests technical information on drillable composite cementing strings for a possible Mumbai High pilot. The response deadline is 29 October 2026.
Oil and Natural Gas Corporation Limited (ONGC), EOI notice↗
w.
Beyond the wellhead, context.
A source-linked view of global energy, wells and resources in seven languages.
Optional first-party analytics records page activity, device/browser details and performance after you accept. IP addresses are encrypted and retained for 7 days; other measurements for 90 days. You can withdraw consent in Privacy choices.
Google Analytics starts only after you accept analytics. Google receives page views, engagement, browser/device details and your connection IP. Analytics cookies last up to 180 days. Search text, URL query strings and referrer paths are excluded. Advertising signals are disabled. You can reject or withdraw in Privacy choices. How Google uses data