Pertamina invites prequalification for hydraulic tubular running services
SKK Migas lists a hydraulic tubular running prequalification for Pertamina EP Zona 1 and Pertamina Hulu Energi Jambi Merang, displayed through 14 October 2026 rather than a confirmed bid deadline.
SKK Migas’s public tender portal lists a prequalification invitation for hydraulic tubular running system services at PT Pertamina EP Zona 1 and PT Pertamina Hulu Energi Jambi Merang. The portal attributes the invitation to PT Pertamina Hulu Rokan. The public title establishes the named service, while the full technical scope and applicant terms are not stated in the listing.
The entry says it is displayed through 14 October 2026. This is the portal’s listing-through date, not a confirmed bid-submission deadline. The notice reference, original issue date, submission time, time zone and monetary value remain unknown. Prospective applicants should consult the issuer’s current documents and amendments before assessing participation.
Optional first-party analytics records page activity, device/browser details and performance after you accept. IP addresses are encrypted and retained for 7 days; other measurements for 90 days. You can withdraw consent in Privacy choices.
Google Analytics starts only after you accept analytics. Google receives page views, engagement, browser/device details and your connection IP. Analytics cookies last up to 180 days. Search text, URL query strings and referrer paths are excluded. Advertising signals are disabled. You can reject or withdraw in Privacy choices. How Google uses data