Story details
Subsea7 announced a September 2 contract from LLOG Exploration for Who Dat East, at approximately 1,300 metres water depth. The development will connect to the Who Dat floating production system.
Scope includes a 29-kilometre riser and pipe-in-pipe system, plus umbilical and subsea controls installation. Offshore work is planned for 2028. Subsea7 places the award in its $50–150 million classification without disclosing the exact price.