Story details

Western Downs Regional Council's RFT000142 seeks proposals for Alluvial Production Bores — Package A. The official detail links the package to the Dalby potable water supply upgrade, whose stated objectives are greater capacity, reliability and resilience. The public scope establishes a water-supply connection, but not a verified list of individual construction tasks.

The detail lists the opportunity as current and gives 16 October 2026 at 17:00 without a timezone. This is retained as a local wall-clock cutoff, not a confirmed UTC instant. Full tender documents and future addenda are supplied through an external portal requiring registration. Well count, construction method, publication date and value are not established in the public detail; applicants should obtain the current documents before responding.