Equinor opens Kårstø marine robotics test centre
The KNARR facility connects testing to operating infrastructure, with three subsea depth zones available.
Global oil, natural gas, power, water, geothermal and mining news, well data and market analysis. Primary sources, clear dates and reporting in seven languages. Page 3
Petrol: 494 results · Clear search
The KNARR facility connects testing to operating infrastructure, with three subsea depth zones available.
Higher prices and output support earnings as the company raises its 2026 growth expectation to around 4%.
Quarterly revenue rises sequentially, while the power business expands its contracted portfolio.
Westlawn takes a 40% interest in South Prudhoe as 88 Energy retains operatorship and plans an early-2027 exploration well.
ABS annual national accounts report 2.3% chain-volume GDP growth, 0.8% growth in GDP per capita and a household saving ratio of 6.1% for 2025–26.
The ABS released its first monthly modelled labour-force estimates for Australia’s SA4 regions. September unemployment rates ranged from 2.6% to 6.8%, with a 4.4% median.
Stats NZ says CPI increased 0.7% in the September quarter and 3.7% over the year, with annual electricity prices up 9.3% and quarterly petrol down 6.5%.
INSEE’s October business survey found a −53 balance on public works order books, the weakest since April 2016. A seasonally adjusted 64% of firms cited insufficient demand; these are opinions, not measured output.
Jordan licensed 6.81 million square metres of building area in the first eight months of 2026, up 5.7% year on year, while permits rose 3%, Department of Statistics figures reported by Petra show.
Jordan’s goods trade deficit narrowed by JD616 million in January–August 2026 as exports grew faster than imports, Department of Statistics figures reported by Petra show.
The State House says Lee Engineering built two midline compressor stations in Edo State to help the Escravos–Lagos Pipeline System reach its designed capacity of 2.3 billion standard cubic feet per day.
The transportation ministry’s permanent secretary said the Kaduna–Zaria–Kano standard-gauge railway was about 90% complete during an October 23 inspection, while land and compensation issues remained.
A source-linked view of global energy, wells and resources in seven languages.