Wellficent / Energy news: oil, gas, power and wells — Page 47 Energy focus + Well tools Tenders Refineries Energy analyses All energy news EPC contractor news Power Oil Natural gas Wells and drilling Renewables EPC contractors Water WELLFICENT / NEWSROOM
Energy news: oil, gas, power and wells — Page 47 608 stories Oil, natural gas, power, renewables, geothermal, water and drilling developments, reported with primary sources, clear dates and well-industry context. Page 47
Energy / 21 September 2026 EPDK opens an application window following Levant’s proposed export licence amendment.
Enerji Piyasası Düzenleme Kurumu ↗
Energy / 25 September 2026 EPDK lists reservations at the Kıyıköy and Türkgözü entry points.
Enerji Piyasası Düzenleme Kurumu ↗
Energy / 21 September 2026 The September 21 announcement outlines vehicle, charging-point, power and consumption coverage.
Enerji Piyasası Düzenleme Kurumu ↗
Energy / October 2026 The schedule sets pipeline-specific charges in Turkish lira per barrel.
BOTAŞ ↗
Energy / 1 October 2026 Two solar and storage projects in Aydınlı share a single planning announcement.
Enerji ve Tabii Kaynaklar Bakanlığı ↗
Energy / 1 October 2026 Plans covering parcel 1116 in Kınık opened for inspection on October 1.
Enerji ve Tabii Kaynaklar Bakanlığı ↗
Energy / 2 October 2026 A 15-day inspection period has begun for the solar and storage project in Şıhahmet.
Enerji ve Tabii Kaynaklar Bakanlığı ↗
Energy / 2 October 2026 Plans for the wind and storage development in Pınarhisar were approved on September 24.
Enerji ve Tabii Kaynaklar Bakanlığı ↗
Energy / 2 October 2026 Plans for the Dibekdere and Karakuyu project are available for inspection from October 2.
Enerji ve Tabii Kaynaklar Bakanlığı ↗
Energy / 29 September 2026 The minister set out domestic and overseas production ambitions in Filyos.
Enerji ve Tabii Kaynaklar Bakanlığı ↗
Energy / 13 August 2026 The combined hard coal and brown coal share reached a new low in 2025.
Eurostat ↗
Energy / 14 August 2026 The first-quarter estimate reached 837 million tonnes of CO2-equivalent.
Eurostat ↗
w. Beyond the wellhead, context. A source-linked view of global energy, wells and resources in seven languages.
Follow via RSS ↗ Privacy choices Optional first-party analytics records page activity, device/browser details and performance after you accept. IP addresses are encrypted and retained for 7 days; other measurements for 90 days. You can withdraw consent in Privacy choices.
Google Analytics starts only after you accept analytics. Google receives page views, engagement, browser/device details and your connection IP. Analytics cookies last up to 180 days. Search text, URL query strings and referrer paths are excluded. Advertising signals are disabled. You can reject or withdraw in Privacy choices. How Google uses data
Accept analytics Reject analytics Privacy