Rosatom's TVEL fuel division commissioned its Moscow-region gigafactory on 6 October, according to the company release republished by Russia's Federal Air Transport Agency on 7 October. The lithium-ion facility is intended to make energy-storage batteries for electric transport and stationary power systems and forms part of a robotic battery-manufacturing cluster.
TVEL gives the facility a rated capacity of 4 GWh per year. It also reports that trial runs produced about 20 battery packs for the Atom electric car, about 600 battery modules and more than 40,000 cells. Those are trial-run figures; the release does not report full-year commercial output.
ODRÉ’s 10 October data refresh lists September deliveries of 1.800 TWh to chemicals, 1.361 TWh to refining and petrochemicals, 0.800 TWh to metallurgy and 2.032 TWh to centralized power generation.
Open Data Réseaux Énergies (ODRÉ), NaTran monthly industrial gas consumption dataset↗
The municipality says electricity work is scheduled from 15:00 to 17:00 on 13 October for three listed supply locations in Capanna and Vallo, not the entire town.
Comune di Vetto, notice of planned electricity supply interruption↗
w.
Beyond the wellhead, context.
A source-linked view of global energy, wells and resources in seven languages.
Optional first-party analytics records page activity, device/browser details and performance after you accept. IP addresses are encrypted and retained for 7 days; other measurements for 90 days. You can withdraw consent in Privacy choices.