NERC Yola schedule lists different October caps for two Adamawa feeders
The regulator’s Yola schedule assigns a 76 kWh cap to Gombi Town service band D and 121 kWh to Hong Town service band D. The figures are monthly energy caps, not electricity prices or measured consumption.
Nigerian Electricity Regulatory Commission’s October 2026 schedule for Yola Electricity Distribution lists separate caps for two feeders in Adamawa. The table gives 76 kWh for 11 kV Gombi Town, non-MD service band D, and 121 kWh for 11 kV Hong Town, also band D.
The PDF is headed ‘Monthly Energy Cap (October 2026); Energy Consumed in September 2026’. The cap column is measured in kilowatt-hours and is organized by feeder and non-MD service band for unmetered customers under the cited methodology. The September reference is the consumption period associated with the October schedule; the listed cap values are not prices per kWh or a claim of measured energy used by every customer.
These two Adamawa rows are examples from the Yola distribution schedule. They do not establish one uniform cap for all locations, feeders or customer categories in the distribution area.
Optional first-party analytics records page activity, device/browser details and performance after you accept. IP addresses are encrypted and retained for 7 days; other measurements for 90 days. You can withdraw consent in Privacy choices.
Google Analytics starts only after you accept analytics. Google receives page views, engagement, browser/device details and your connection IP. Analytics cookies last up to 180 days. Search text, URL query strings and referrer paths are excluded. Advertising signals are disabled. You can reject or withdraw in Privacy choices. How Google uses data