Story details

Nigerian Electricity Regulatory Commission’s October 2026 schedule for Yola Electricity Distribution lists separate caps for two feeders in Adamawa. The table gives 76 kWh for 11 kV Gombi Town, non-MD service band D, and 121 kWh for 11 kV Hong Town, also band D.

The PDF is headed ‘Monthly Energy Cap (October 2026); Energy Consumed in September 2026’. The cap column is measured in kilowatt-hours and is organized by feeder and non-MD service band for unmetered customers under the cited methodology. The September reference is the consumption period associated with the October schedule; the listed cap values are not prices per kWh or a claim of measured energy used by every customer.

These two Adamawa rows are examples from the Yola distribution schedule. They do not establish one uniform cap for all locations, feeders or customer categories in the distribution area.