Produced water and handling cost
Separate water fraction, water-to-oil ratio and water handling cost.
Inputs are sent to the server for this calculation without being saved or added to the URL. Saving a scenario stores it only in this browser.
Worked example
Example inputs are illustrative, not data from a real well.
Calculation inputs
- Liquid volume unit
- bbl
- Oil volume in the same period
- 100 bbl
- Produced-water volume in the same period
- 300 bbl
- Water handling cost per unit
- 2 currency/bbl
Calculation result
- Total liquid volume
- 400 bbl
- Water fraction of total liquid
- 75 %
- Water-to-oil ratio
- 3 ratio
- Period water handling cost
- 600 currency
- Water handling cost per oil unit
- 6 currency/bbl
Formula and assumptions
Use oil and produced-water volumes at compatible measurement conditions, for the same period and scope. Produced water is not a groundwater-level measure. With zero oil, the water-to-oil ratio and cost per oil unit are undefined. Gas and treatment suitability are excluded.
waterCut = 100 × water / (oil + water); WOR = water / oil; C = water × handlingCostMethod references
Saved scenarios
Saved inputs remain on this browser and can be removed individually. They are not shared with a team or synchronized between devices.