Ballymore first production: the April 2025 milestone and Blind Faith tieback
Ballymore started production in April 2025. Its stated gross capacity is 75,000 barrels of oil daily, with gas reported separately.
Global oil, natural gas, power, water, geothermal and mining news, well data and market analysis. Primary sources, clear dates and reporting in seven languages. Page 2
Petróleo: 494 results · Clear search
Ballymore started production in April 2025. Its stated gross capacity is 75,000 barrels of oil daily, with gas reported separately.
Woodside’s third-quarter report records gas entering the FPU and trunkline. That milestone does not establish that an LNG cargo has shipped.
Equinor operated 35/10-11 S and A with DNO as partner. The 2024 report describes a 12-metre column in the sidetrack and no formation test.
The official release is dated 5 November 2026. Quarter averages, individual-well initial rates and preliminary guidance have distinct scopes.
The 28 October release reports Leismer at 25,020 barrels daily and targets 40,000 by the end of 2027. Corporate output has a different scope.
The Sarawak gas agreements envisage an integrated development supplying Malaysia LNG; completion and operatorship remain conditional.
The 2.8 billion boe figure is a directorate estimate across mapped tight reservoirs, not newly booked reserves for the alliance.
The verified agreement grants Eni operatorship for 25 years; oil in place and dated production must remain separate.
Equinor reports a 77–180 million boe estimate and a possible Kvitebjørn tieback; the estimate is not a production measurement.
Refining margins supported results while several other businesses recorded lower sequential earnings.
The company reported US$2.015 billion of attributable net income despite lower crude throughput.
Sabres and Whalers add to the operated producing base while flowback and clean-up continue.
A source-linked view of global energy, wells and resources in seven languages.