FROM WELLHEAD TO MARKET. NEWS WITH SOURCES.
Our standards
wellficent.
Global energy, wells and resources.
News, data and analysis.
WELL & ENERGY INTELLIGENCE
Energy focus +
WELLFICENT / NEWSROOM

Search: Eau — Page 6

237 stories

Global oil, natural gas, power, water, geothermal and mining news, well data and market analysis. Primary sources, clear dates and reporting in seven languages. Page 6

Eau: 237 results · Clear search

Economy / 10 October 2026

Cologne gauge reads 0.6 metres at 20:45

StEB Köln reported a 0.6-metre Kölner Pegel reading at 20:45 CEST on 10 October.

Stadtentwässerungsbetriebe Köln (StEB Köln)
Energy / 10 October 2026

Saneago repairs treated-water main in Goiatuba

Saneago said an emergency treated-water-main repair underway on 10 October could affect 27 named neighborhoods and settlements in central and upper Goiatuba.

Saneago — Equipes recuperam rede de água em Goiatuba
Energy / 9 October 2026

Power outage at Pirenópolis intake affects water supply

Saneago reported on 10 October that a power loss at Pirenópolis's water intake had affected supply since the previous evening, 9 October, and that it installed a temporary generator; recovery will be gradual.

Saneago — Falta de energia na captação afeta abastecimento em Pirenópolis
Energy / 13 October 2026

Dionéo schedules overnight water interruption in Saint-Denis

Dionéo's communiqué 152124, dated 10 October, schedules a water interruption on listed Saint-Denis streets from 22:00 on 13 October, with service expected to resume from 05:00 on 14 October.

Dionéo — Communiqué 152124, Travaux sur le réseau
Energy / 10 October 2026

Acque closes Latignano drinking-water fountain after equipment fault

Acque said a high-quality water fountain on Via Risorgimento in Latignano was switched off on Saturday, 10 October, after an equipment fault; reopening is planned for 16 October.

Acque SpA — Temporanea sospensione servizio fontanello nel comune di Cascina
Economy / 10 October 2026

Piauí dam project reaches 57.32% completion

The Nova Algodões dam at Cocal has reached 57.32% completion, with R$240 million in federal New PAC funding reported for the project.

Piauí government — Barragem Nova Algodões reaches 57.32% completion
Economy / 10 October 2026

Porto Alegre schedules maintenance at Belém Novo water station

The city’s Dmae plans work on the Belém Novo treatment station and Xavantes pumping station on 15 October, with possible service effects in 20 neighborhoods.

Porto Alegre Dmae — ETA Belém Novo preventive maintenance notice
Energy / 10 October 2026

EDF posts doctoral research proposal on hydropower penstock aeration

EDF advertised a three-year doctoral project to study aeration and hydraulic loads in hydropower penstocks, including valve closure and cavitation.

EDF — Caractérisation expérimentale de la dynamique d’aération d’une conduite forcée F/H (2026-184279)
w.

Beyond the wellhead, context.

A source-linked view of global energy, wells and resources in seven languages.

Follow via RSS ↗